What to send us for a PCBA quote — and what comes back

Most first enquiries to a contract manufacturer are missing one of three files, and the reply is a question rather than a price. Here is exactly what a quote needs, what makes it accurate rather than approximate, and what you should expect to receive in return.

  • GerberRS-274X
  • BOMWith manufacturer part numbers
  • QuantityHow many boards
  • You get backA DFM report, not a price
The short answer: a quote needs three things — the Gerber files, a BOM with manufacturer part numbers, and a quantity. Everything else improves accuracy. What comes back should be more than a number: a DFM report listing anything in your design that will cause trouble on the line, so you find out before tooling is cut rather than after.
A YAMAHA SMT placement machine with component feeders loaded, the point at which the files you send become a physical assembly
Your files end up hereEverything in a Gerber file and a BOM becomes a feeder position, a stencil aperture and a placement program at this machine. A missing courtyard or an unlisted part number turns into a phone call instead of a quote.

The three files a quote cannot be made without

If one of these is missing, you will get a question back instead of a price.

Required for any quote
WhatFormat we acceptWhat breaks without it
Gerber filesRS-274X or RS-274DNo fabrication price is possible at all. Board outline, copper layers, solder mask and silkscreen must all be present.
BOMExcel, CSV or PDFAssembly cannot be priced. Needs reference designator, quantity per board, and manufacturer part number.
QuantityAnyA per-unit price is meaningless without it. Tell us the build quantity and, if you know it, the annual volume.

We also accept native design files from KiCad, Eagle, Altium/Pro-E and AutoCAD (DXF/DWG). They are useful for checking intent, but the Gerber set is what the board is actually built from — if the two disagree, the Gerber wins.

Four more files that turn an estimate into a price

All optional. Each one removes an assumption we would otherwise have to make — and assumptions are what make a quote move after you accept it.

Optional, but they stop the price moving later
WhatWhy it changes the number
Pick-and-place / centroid fileLets us price placement from your intended positions instead of deriving them from the Gerber. Removes a common source of mid-project rework.
Assembly drawing or notesWhich parts are through-hole, which side they sit on, which are not fitted, which are hand-soldered. Without it we assume, and an assumption on side count changes the stencil count.
Test requirementsWhether you need functional test, programming, or a harness. Test is a separate cost line and it is the one most often added after the first quote.
Special processesConformal coating, potting, depanelisation, custom packaging, labelling. Each is a separate operation with its own setup.

What you get back within 24 hours

A price on its own is not a finished answer. Three things should come back together.

1. A DFM report

DFM stands for design for manufacturability — a review of your design against what the production line can actually hold. It is not a style critique, and it is not a sales document. It is a list of specific places where your design will produce defects, cost more than it needs to, or fail inspection, each with the specific change that fixes it.

Typical DFM findings: a pad size that will tombstone a small passive; a component courtyard that overlaps a neighbour; a via in a pad that will wick solder away; a silkscreen reference designator printed over an exposed pad; a panel layout that leaves too little material between boards to route cleanly; a single fine-pitch part that forces the whole board onto a slower line.

2. A quote with the cost lines separated

Ask for fabrication, components, assembly, test and tooling as separate lines. A single all-in number cannot be compared against another supplier, and it cannot be renegotiated when one of the drivers changes. Separated lines also let you see which lever is actually worth pulling — see where the cost goes in small-batch PCBA.

3. A lead time with its assumptions stated

Lead time depends on component availability more than on anything we control. A useful quote says which part is setting the date, and what the date would be if that part were substituted. See where the weeks actually go.

The gaps that add days to a quote

None of these are unusual. All of them cost time, and all of them are avoidable.

Slows a quote down

A BOM with description only and no manufacturer part number — we have to identify the part before we can price it.

"See attached" with no attachment.

A Gerber set with no board outline layer, or with the outline on the same layer as the copper.

Quantity given as a range with no starting point.

A question about a capability that is already published — the parameter tables answer most of them.

Gets you a price the same day

Gerber, BOM with part numbers, and a quantity — in one message.

A note on which parts are critical or long-lead, so we can flag them first.

The target annual volume, not just this build.

A named person on your side who can answer a DFM question quickly.

What we do not need from you

You do not need a finished, perfect package before contacting us. If your BOM is incomplete, send what you have — we will tell you what is missing rather than decline the enquiry. If your Gerber is still moving, send the current revision and mark it as provisional. A half-complete enquiry that arrives today is more useful than a complete one that arrives in three weeks.

Equally, we do not need your design files under NDA to give you a price for a standard process. If you would like an NDA before sending files, say so in the first message and we will send ours back — it is a normal request and it does not slow anything down as long as it is asked for up front rather than after the files have been sent.

Common questions

Can you quote from a Gerber file alone?

For the bare board, yes — Gerber files plus a quantity are enough to price fabrication. For assembly we also need a BOM with manufacturer part numbers, because component cost is the largest variable in an assembly price and it cannot be estimated from the board layout.

Do I need to sign an NDA before sending you files?

No. We give prices for standard processes without an NDA. If your project requires one, say so in your first message and we will send our NDA back for signature before any files are transferred — asking up front costs no time, asking after the files have been sent does.

What if my BOM is incomplete?

Send it anyway and mark what is still open. A BOM missing part numbers, or with parts marked TBD, is a normal state for a design that is still moving. We will tell you which gaps stop us pricing and which ones we can work around.

Related guides

How long does PCBA take?

The four stages between sending files and receiving boards — and which one is setting your date.

Why 100 boards cost so much per unit

Where the money goes at low volume, and eight levers that bring the per-unit price down.

Frequently asked questions

MOQ, quote turnaround, component sourcing, certifications, board size limits and testing.