About us

PCB, PCBA and component sourcing — a Shenzhen manufacturer, established 2005

Hongrong (Shenzhen) Electronics Co., Ltd. has been building electronics in Bao'an, Shenzhen since 2005 — through the launch of the smartphone, the component shortages, and everything since.

  • Founded2005
  • Employees125 in Shenzhen
  • Overseas salesRMB 300 M
  • Smallest order1 piece
In short: founded in 2005, 125 employees in Shenzhen, approximately RMB 300 million in overseas sales, certified to IATF 16949, ISO 13485, ISO 9001 and IPC-A-610 Class III — and we still take orders as small as 1 piece.

The company, in numbers

Facts a buyer can check, rather than adjectives a buyer has to trust.

Company facts
Established2005 — over 20 years of electronics manufacturing
Employees125 — in Shenzhen
Annual overseas salesApproximately RMB 300 million
Manufacturing24 SMT lines, 6 DIP lines, 10 conformal-coating lines and 6 testing lines — in the same building as the engineering team
Placement capacity40.39 million placement points per day
Minimum order1 piece — no minimum order quantity, at every stage from prototype to production
Head office and factory6/F, Bldg C, Qianwan Key & Core Tech Park, Xixiang St., Bao'an, Shenzhen, Guangdong, China
Second officeLos Angeles, California, USA
Customers located inEurope, the Americas and Asia
CertificationsIATF 16949 · ISO 13485 · ISO 9001 · IPC-A-610 Class III

What "one-stop" actually means here

It is the most over-used phrase in this industry, so here is the specific version of it.

"One-stop" means one company is accountable for every step between your schematic and a tested, packed board — not that one company resells all of those steps. Concretely, that is seven steps, and all seven happen under this roof:

  1. Electronic and industrial designDesign support before manufacturing, so the board you send us is the board that can actually be built.
  2. PCB and FPC fabricationRigid, flexible and rigid-flex circuits from 1 to 32 layers, minimum line and space 0.06 mm, on substrates up to 650 × 1,100 mm.
  3. Component sourcingFrom named suppliers including Sharp, Toshiba, STMicroelectronics, Samsung, Infineon, JRC and NEC — and a qualified replacement when a part has gone obsolete.
  4. SMT and through-hole assembly24 SMT lines (13 YAMAHA, 4 Panasonic, 7 JUKI) and 6 DIP lines, with a combined capacity of 40.39 million placement points per day — components down to 01005, BGA at 0.3 mm pitch.
  5. Conformal coating and testing10 coating lines and 6 testing lines, with in-line and offline AOI, 3D SPI, 3D X-ray, first-article inspection and BGA rework.
  6. Metal and plastic injection mouldingEnclosures and mechanical parts produced alongside the electronics, so the finished product ships complete.
  7. Board separation, packing and shippingTest data, first-article records and a certificate of conformity travel with the boards.

If your project needs more than the board, the same factory also runs wire assembly and box build — harnesses and finished units, not only populated boards — plus component forming, IC programming and electrical function testing. Those sit outside the seven steps because not every order needs them; say so when you send the BOM and they are added to the same quote.

Two things follow from that, and neither is about the length of the list. The first is that when something goes wrong in the middle of the chain — a part that will not be available, a footprint that will not solder — the problem belongs to one company instead of two. The engineer who read your files sits in the same building as the lines that build the board.

The second is a limit. This is a contract manufacturer built for small-batch, certification-driven work: a run in the millions at the lowest possible unit price is not what this building is set up to do, and we say so rather than quote for it. Who we are right for sets that out without flattery.

How an order runs, from your files to the shipment

The same steps run whether you need 1 board or 10,000. What changes is the lead time, and that is scheduled by quantity — not by how large a customer you are.

From Gerber files to shipment

  1. First reply

    A person reads your Gerber files and BOM and comes back — usually with questions, if anything in the files is unclear — within 2 hours.

  2. Quote

    A price, a lead time, and anything in your files we think will cause a problem on the line, within 24 hours. Complex assembly quotes can take up to 48 hours, and we tell you when that is the case.

  3. First article

    The first production lot is inspected against your drawing, not against a sample board, before the rest of the run proceeds.

  4. Production

    Lead time is scheduled by quantity: up to 5 units, 7 days · 6–1,000 units, 14 days · 1,001–10,000 units, 21 days. Above 10,000 units a run is scheduled individually. The clock starts when you approve the final BOM and Gerber files.

  5. Bare boards only

    If your order is fabrication only — no components placed — the published lead time is 3–4 days for a prototype and 8–16 days for mass production, with an expedited prototype service inside 24 hours.

  6. Shipment

    Boards, test data, first-article records and a certificate of conformity — plus component traceability for the parts we sourced.

Nothing above changes at an order size of one. There is no minimum order quantity: the same files, the same first article and the same paperwork apply to a single piece as to a run of ten thousand.

Certifications

These are the four that let us build for automotive and medical customers — and they are the reason a customer with a regulated product can use a factory this size.

IATF 16949

The automotive quality management standard. Required by most vehicle manufacturers and their tier-one suppliers.

ISO 13485

The medical device quality management standard. It governs traceability, documentation and process control for products where a defect reaches a patient.

ISO 9001

The general quality management standard — the baseline that IATF 16949 and ISO 13485 build on.

IPC-A-610 Class III

The strictest IPC workmanship class, for products where continued operation is essential — medical, aerospace and defence.

Documents we will send you

We would rather send you the real paperwork than a logo. Ask and it comes back the same working day.

On the ground

Where we sell

We exhibit at industry shows in the markets we serve, and we travel to meet customers rather than conducting every relationship by email. If you are evaluating suppliers from a distance, ask us for a video call and we will walk you through the line.

Where we have exhibited, we will send you the official exhibitor directory entry with the show name and year — so you can verify it independently rather than taking our word for it.

A Hongrong (Shenzhen) Electronics exhibition booth at an industry trade show: fascia board, product posters and a glass display case, photographed before the doors opened
Hongrong's office in Los Angeles, California

Los Angeles office

A small office in California means US and Canadian customers have a contact in their own time zone, and a place to escalate to if something needs to be resolved quickly. Shenzhen runs on China Standard Time (UTC+8) and Los Angeles on Pacific Time; both work Monday to Friday.

The Qianwan Key & Core Tech Park building in Bao'an, Shenzhen, where Hongrong's factory and head office are located
Qianwan Key & Core Tech Park, Bao'an — the building our factory and head office occupy. Shenzhen, Guangdong.

Why there is no wall of customer logos on this page

Because we do not publish a customer's name, logo or product without their written permission. Most of the work we do is for companies who would rather their competitors did not know who builds their boards.

You have seen the alternative: a grid of household-brand logos on a supplier's homepage, where a contract manufacturer of a few hundred people implies it supplies four global vehicle makers. Ask yourself how often a company that size is genuinely a direct, contracted supplier to all of them.

So we will not do it — and we would suggest you treat any supplier who does with more caution, not less.

What we can share instead

Work with us

Send us your Gerber files and BOM. We will reply within 2 hours and quote within 24 — with a person who read your files, not an auto-reply.

Get a quote